Customization: | Available |
---|---|
After-sales Service: | Remote Video Technical Support Available |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tarpaulin Double Heads Welder is custom built with dual hot air systems to simultaneously weld two outside edges andrope insertion.
This machine including three parts: Feeding platform, Main machine, conveyor parts.It seals both the edges of the tarpaulin simultaneously by a press of a foot switchThe excess center fabric will move along on the conveyor as the sides get sealed, added feature it will have ropereinforcement arrangements, which is a necessity for the tarpaulin
Finishing of tarpaulin will be faster once it is center welded on the main welding line. Labor saving engaged on the sealingline that can by manually operated.
Capacity: 60 Mt/Min at optimum speed. (Depending on operating conditions)
Voltage | 380V/50Hz or customized |
Power | 10.4KW |
Temperature range | 0-650 ºC |
Temperature tolerance | ±2 ºC |
Welding material | Hot air |
Dimension | 10*1.5 *2M or customizable |
Customizable | Yes |
OEM | Permissable |
Tarpaulin Double Heads Welder Features:
1. Dual heat systems for simultaneous edge welding2. Custom table for reduced material handling
3. Complete with indexing for ability to handle multiple size screens4. Simple controls with touch screen interface for easy operation
It seals both the edges of the tarpaulin simultaneously by a press of a foot switch
Qingdao xinruide equipment co.,lt is mainly specializng in the manufacture and reaserch of machinery machine, multi-head welding mahcine, PE PVC eyelet punching machine, automatic strapping machine,etc. Located in Qingdao, we have comfortable environment and convenient transportation access.Lying on the principle of high quality, reasonable price, we have many customers from domestic and overseas.
We would like to protect our products in good condition, so small parts will use plywood box, but large volume will be nuded packing and we wrap key position with waterproof wrap.film.
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.